Rutledge Excavating successfully undertook the Main Street Over Little Lake Erie Outlet Culvert Replacement Project. Located in Narrowsburg, NY, this significant endeavor required meticulous planning and execution to replace the existing culvert structure with a new one. Integral to the project was the installation of a temporary bridge to facilitate uninterrupted traffic flow throughout the construction phase.
Rutledge Excavating demonstrated expertise in managing complex infrastructure projects, ensuring both safety and efficiency while delivering exceptional results.